Year

Our projects - 2010

RTON Wałbrzych

Erection of a 70-m radio tower in Wałbrzych – Chełmiec based on a design performed in cooperation with Ramboll Denmark.

The contract included design, formal arrangements, delivery and erection of a tower with foundations. The site is located in a National Park protected as “Nature 2000” on a 904m hill. The foundations were erected 5 m deep in a rock using 150m3 of a reinforced concrete. For the project we designed and manufactured an innovative derrick.

TSR Jedlina Zdrój

Reinforcement of a 37-m steel tower in Jedlina Zdrój by means of a repalcement of a main tower on an existing foundation – design and realization without broadcast interruption.

RON Kraków/ Malczewskiego

Exchange of the upper level of guy ropes and the main insulator in the mast base on a 120-m mast in Kraków.