Design, permissions and “turn-key” construction of a Radio-TV Broadcasting Centre Jagodnik nearby Elbląg, 115 m.
It was the fastest turn-key construction in Poland. Design works started on the 3.06.1999, construction works on the 13.08.1999, and on the 30.12.1999 the site started broadcasting. It was the first unmanned site in Poland.
Draft of technical and economic assumptions within the scope of a centre in Kisielice construction.